New construction project
The 12.250 dwt. IMO TIER III MPP Project Carriers are flexible, heavy lift ships equipped with two cranes with a SWL of each 250 mt. Its optimized hull shape (abt. 20.000 simulations) and the innovative propulsion system, allows the Eco Trader to reduce the fuel consumption as well as the CO2 emission by more then 35% compared to equivalent modern tonnage. Consumption “15 mt at 15 knots”. Being equipped with a Ships Performance Monitoring System as well as an Energy Management System, the TIER III ECO-Trader is today already meeting the IMO EEDI limits for vessels being built as from 2025. A high crane pedestal and long crane jib facilitate large lifting heights, which are available at all outreaches. The beam of the vessel also ensures that the cranes can be used to their full capacity, without the need for a stability pontoon. A large, unobstructed hold of 76,5 m (15.215 m3) allows long units to be stowed under deck. The small hold (1.685 m3) allows dangerous goods of almost all classes to be loaded. In combination with its redundant camera system, the extended, fully flush hatch covers allow maximum loading capacity for any high cubic stowing cargoes.